检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘凯波 蒙立瀚 尚晓威 LIU Kaibo;MENG Lihan;SHANG Xiaowei(China Anneng Second Engineering Bureau Co.,Ltd.,Nanchang 330096,Jiangxi,China)
机构地区:[1]中国安能第二工程局有限公司,江西南昌330096
出 处:《水利水电技术(中英文)》2022年第S02期42-44,共3页Water Resources and Hydropower Engineering
摘 要:某山岭隧道洞口以全风化花岗岩为主,围岩级别为V级,工程地质条件很差。采用留核心土环形开挖施工,根据监控量测数据发现,拱顶下沉及周边位移量有趋于增加的趋势。为了安全作业,对隧道V级围岩段采取相应措施进行有效指导施工。The entrance of a mountain tunnel is mainly made of completely weathered granite,and the surrounding rock is grade V,so the engineering geological conditions are very poor.According to the monitoring data,it is found that the vault settlement and surrounding displacement tend to increase.In order to operate safely,the corresponding measures should be taken to effectively guide the construction of the V-Class surrounding rock section of the tunnel.
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185