丰满重建工程设计洪水复核研究  被引量:1

Study on design flood review of Fengman Reconstruction Project

在线阅读下载全文

作  者:张永胜[1] 黄建辉[1] 邹浩[1] 马壮壮 ZHANG Yongsheng;HUANG Jianhui;ZOU Hao;MA Zhuangzhuang(China Water Northeast Investgation,Design and Research Co.,Ltd.,Changchun 130021,Jilin,China)

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021

出  处:《水利水电技术(中英文)》2021年第S01期159-164,共6页Water Resources and Hydropower Engineering

基  金:国家重点研发计划(2018YFC1508000)

摘  要:松花江流域在丰满水电站重建工程可研设计之后又相继发生了2010年、2013年大洪水,为满足工程施工期防洪、度汛要求,有必要开展白山—丰满梯级水库设计洪水复核工作,以合理分析确定梯级水库设计洪水成果,为白山、丰满水库防洪联合调度提供技术支持和依据,保障梯级水库防洪调度安全。Floods occurred in 2010 and 2013 successively in the Songhua River basin after the feasibility study design of the reconstruction project of Fengman Hydropower Station,it is necessary to carry out the flood design review of Baishan-Fengman cascade reservoir,in order to meet the requirements of flood control and construction during flood period.Which purpose is to reasonably analyze and determine the design flood results of cascade reservoirs,and provide technical support and basis of Baishan-Fengman Reservoir flood control joint dispatching to ensure the safety of flood control dispatching of cascade reservoirs.

关 键 词:丰满重建工程 设计洪水 汛期分期洪水 设计洪水过程线 

分 类 号:TV122.3[水利工程—水文学及水资源] TV74

 