检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢燕华 阿宗千 LU Yanhua;A Zongqian(Yunnan Construction Investment No.1 Water Conservancy and Hydropower Construction Co.,Ltd.,Kunming,Yunnan 650217,China)
机构地区:[1]云南建投第一水利水电建设有限公司,云南昆明650217
出 处:《施工技术》2020年第S01期1600-1601,共2页Construction Technology
摘 要:随着我国基础设施的不断建设,隧洞混凝土施工越来越广泛,混凝土在基岩地下水的冲蚀下,发生对钢筋锈蚀、混凝土溶蚀,缩短隧洞寿命、降低使用年限。混凝土土浇筑后,大量地下水被归集,从施工缝部位渗出。隧洞固结灌浆能有效的固结岩体、阻断地下水,针对地下水位线下不良地质段固结施工技术分析总结。并进行工程经济效果评价。With the continuous construction of infrastructure in our country,the tunnel concrete construction is more and more extensive.Under the erosion of bedrock groundwater,the concrete corrodes the steel bar,dissolves the concrete,shortens the service life of the tunnel and reduces the service life.After the concrete soil is poured,a large amount of groundwater is collected and seeps out from the construction joint.Tunnel consolidation grouting can effectively consolidate the rock mass and block the groundwater.This paper analyzes and summarizes the consolidation construction technology for the unfavorable geological section under the groundwater level.And evaluate the economic effect of the project.
分 类 号:TV543.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249