海外第三代核电站大联合泵房蜗壳流道施工技术  被引量:1

Construction Technology of Volute Channel in Large Union Pump Room of the Third Generation Nuclear Power Station Overseas

在线阅读下载全文

作  者:卜富财 BU Fucai(China Nuclear Group China Zhongyuan Foreign Engineering Co.,Ltd.,Shanghai 200051,China)

机构地区:[1]中核集团中国中原对外工程有限公司,上海200051

出  处:《施工技术》2020年第S01期841-846,共6页Construction Technology

摘  要:通过某海外1100 MW第3代核电站最大的联合泵房蜗壳流道施工案例,采用阿波罗专用模板进行支护,通过科学的管理和多方技术的整合,攻克了不规则形体混凝土结构施工的难关,系统地对目前最大的取水泵房的蜗壳流道混凝土结构的施工工艺技术进行总结。Through the construction case of volute channel of the largest combined pump house of a 1100 MW third generation nuclear power station overseas,Apollo special formwork is used for support.Through scientific management and integration of multiple technologies,the difficulty of irregular concrete structure construction is overcome,and the construction technology of volute channel concrete structure of the largest water intake pump house is systematically summarized.

关 键 词:核电站 联合泵房 蜗壳流道 混凝土结构 施工技术 

分 类 号:TM623[电气工程—电力系统及自动化]

 