超高层建筑设备机房机电安装一次成优率提升方法  被引量:8

Methods to Improve the First-time Optimal Rate of Mechanical and Electrical Installation in Equipment Room of Super High-rise Building

在线阅读下载全文

作  者:张亚玲 王跃飞[1] 黄联盟 ZHANG Yaling;WANG Yuefei;HUANG Lianmeng(China Construction Eighth Engineering Division Co.,Ltd.(Huabei),Tianjin 300450,China)

机构地区:[1]中国建筑第八工程局有限公司华北分公司,天津300450

出  处:《施工技术》2020年第S01期939-942,共4页Construction Technology

基  金:国家自然科学基金资助项目(51377044)

摘  要:现代超高层建筑业态众多,更注重节能、舒适、智能化,需要配置众多的机电系统。机房作为机电系统的核心,对各项功能的实现起到关键作用,提高机房机电安装一次成优率对于整个超高层建筑质量管控有重大意义。结合周大福金融中心机房机电安装过程,分析机电安装一次成优的影响因素,根据实际情况研究得出提升机电安装一次成优率的方法。Modern super high-rise buildings there are numerous types,which pay more attention to energy saving,comfort and intelligence,so need to be equipped with many electromechanical systems.As the core of the mechanical and electrical system,the M&E room plays a key role in the realization of various functions.It has great significance for the quality control of the whole super high-rise building what improve the primary optimization rate of the mechanical and electrical installation of the M&E room.Combined with the mechanical and electrical installation process of Tianjin CTF Financial Center,this paper analyzes the influencing factors of the primary optimization of mechanical and electrical installation,and studies the methods to improve the primary optimization rate of mechanical and electrical installation according to the actual situation.

关 键 词:超高层建筑 机电安装 一次成优率 

分 类 号:TU974[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象