检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张亚玲 王跃飞[1] 黄联盟 ZHANG Yaling;WANG Yuefei;HUANG Lianmeng(China Construction Eighth Engineering Division Co.,Ltd.(Huabei),Tianjin 300450,China)
机构地区:[1]中国建筑第八工程局有限公司华北分公司,天津300450
出 处:《施工技术》2020年第S01期939-942,共4页Construction Technology
基 金:国家自然科学基金资助项目(51377044)
摘 要:现代超高层建筑业态众多,更注重节能、舒适、智能化,需要配置众多的机电系统。机房作为机电系统的核心,对各项功能的实现起到关键作用,提高机房机电安装一次成优率对于整个超高层建筑质量管控有重大意义。结合周大福金融中心机房机电安装过程,分析机电安装一次成优的影响因素,根据实际情况研究得出提升机电安装一次成优率的方法。Modern super high-rise buildings there are numerous types,which pay more attention to energy saving,comfort and intelligence,so need to be equipped with many electromechanical systems.As the core of the mechanical and electrical system,the M&E room plays a key role in the realization of various functions.It has great significance for the quality control of the whole super high-rise building what improve the primary optimization rate of the mechanical and electrical installation of the M&E room.Combined with the mechanical and electrical installation process of Tianjin CTF Financial Center,this paper analyzes the influencing factors of the primary optimization of mechanical and electrical installation,and studies the methods to improve the primary optimization rate of mechanical and electrical installation according to the actual situation.
分 类 号:TU974[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28