检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万鑫 WAN Xin(Wuhan Geotechnical Engineering and Surveying Co.,Ltd.,Wuhan,Hubei 430022,China)
机构地区:[1]武汉市勘察设计有限公司,湖北武汉430022
出 处:《施工技术》2020年第S01期228-229,共2页Construction Technology
摘 要:基坑工程施工过程中出现险情时会影响周边构筑物及道路,抢险方式影响项目安全性和经济性。将抽条法应用于基坑工程抢险过程中,配合采用限载、封闭渗水路径、信息化施工等措施,有效控制基坑出现险情后产生的变形,为地下室施工争取时间,兼顾安全性及经济性。In the process of foundation excavation construction,when there is a dangerous situation,it will affect the surrounding structures and roads.The way of rescue will affect the safety and economy of the project.In this paper,the strip method is applied to the rescue process of foundation excavation engineering,with the following measures,such as load limit,closed seepage path,information construction,etc.,effectively controlling the deformation of foundation excavation after the dangerous situation,which is the basement’s time for construction,safety and economy.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.34