检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱迪 梅亚东[1] 许新发[2] 吴贞晖 兰岚[1] ZHU Di;MEI Yadong;XU Xinfa;WU Zhenhui;LAN Lan(State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan 430072;Jiangxi Provincial Institute of Water Sciences,Nanchang 330029)
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072 [2]江西省水利科学研究院,南昌330029
出 处:《水力发电学报》2020年第3期22-33,共12页Journal of Hydroelectric Engineering
基 金:国家自然科学基金(51479140);江西省水利厅科技项目(KT201601).
摘 要:针对由水库群、航电枢纽、分蓄洪区等组成的赣江中下游复杂防洪系统,以防洪控制断面洪峰削减率最大为目标,建立了赣江中下游防洪系统联合防洪调度模型。以"1961"典型洪水及50年一遇、100年一遇和500年一遇设计洪水为研究实例,采用离散邻域的动态规划—逐步优化算法(DP-POA)进行防洪优化调度,并与常规防洪调度结果进行对比。结果表明:梯级水库和分蓄洪区对于赣江中下游削峰起主要作用,而航电枢纽的削峰作用较为有限;对于"1961"典型洪水,航电枢纽的运行可以在一定程度上降低峡江水库调度期内最高水位,有利于水库防洪安全;采用离散邻域的DP-POA算法的防洪优化调度可以较为显著地削减防洪控制断面洪峰流量,保障下游防洪安全。This paper develops a flood control operation model for the middle and lower Ganjiang River that has a complicated flood control system comprising reservoirs,navigation-power junctions,and flood diversion and storage areas,with an objective to maximize the reduction rate of flood peaks at flood control cross sections.This model optimizes the system’s flood control operation using a dynamic programming-progressive optimization algorithm based on a discrete neighborhood,and its results are compared with those of conventional flood control operation,through a case study of the 1961 typical floods and the design floods of 50-,100-and 500-year return periods.The results show that the optimized operation significantly reduces the flood peaks at the flood control sections to ensure the safety of downstream areas.And the cascade reservoirs and flood diversion area play an important role in the flood-control system of the Ganjiang basin,and the effect of navigation-power junctions is very limited.For the 1961 typical floods,operation of the navigation-power junctions can reduce the peak stage of the Xiajiang reservoir to a certain degree,helping enhance the reservoir safety of flood control.
关 键 词:防洪减灾 水库群联合防洪调度 动态规划—逐步优化算法 航电枢纽 分蓄洪区 赣江中下游
分 类 号:TV87[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28