检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜东 颜恩平 熊光东 JIANG Dong;YAN Enping;XIONG Guangdong(Northwest Electric Power Design Institute Co.,Ltd.,China Power Engineering Consulting Group,Xi'an 710075,China)
机构地区:[1]中国电力工程顾问集团西北电力设计院有限公司,陕西西安710075
出 处:《武汉大学学报(工学版)》2022年第S02期199-202,共4页Engineering Journal of Wuhan University
摘 要:电力行业中的大型贮煤筒仓均为钢筋混凝土结构,其顶盖型式对工期、造价和结构安全都有很大影响。对筒仓顶盖采用现浇混凝土和钢梁现浇板等3种不同方案在工期和造价方面进行了对比分析,给出了详细的施工方案和造价清单,得出了采用钢梁现浇板方案是最优方案,为今后工程设计提供借鉴。As an important structure for coal storage in thermal power plants,silo has been widely used due to their unique advantages.At present,the large coal silos in the electric power industry are all reinforced concrete structures,and the roof type has a great influence on the construction period,cost and structural safety.This paper conducts a comparative analysis of the construction period and cost of three different schemes,which adopts cast-in-place concrete or steel beam cast-in-place slab for the silo roof.The detailed construction scheme and cost list are also given in this paper.lt is concluded that the steel beam cast-in-place slab scheme is the optimal scheme and can provide a reference for the future engineering design.
分 类 号:TU745.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.137.32