水利水电工程招标阶段灌浆超灌的管控措施研究  被引量:1

Study on Control Measures of Grouting Overirrigation in Bidding Stage of Water Conservancy and Hydropower Projects

在线阅读下载全文

作  者:吴述国 WU Shuguo(State Energy Dadu River Corporation,Chengdu 610095,China)

机构地区:[1]国能大渡河公司,四川成都610095

出  处:《建筑经济》2022年第S01期434-436,共3页Construction Economy

摘  要:预应力锚索及基础灌浆(固结灌浆及帷幕灌浆)广泛应用水利水电工程建设中,锚索灌浆及基础灌浆的超灌一直是水利水电工程建设管理的一大难题。分析水利水电工程锚索灌浆及基础灌浆施工中超灌的原因,在总结以往超灌浆管控措施经验及问题的基础上,探讨较为系统的且适宜招标阶段采用的综合性管控措施,并介绍在国内多个大型水利水电工程建设中的使用效果。Prestressed anchor cable and foundation grouting(consolidation grouting and curtain grouting)are widely used in the construction of water conservancy and hydropower projects.Overirrigation of anchor cable grouting and foundation grouting is always a difficult problem in the construction and management of water conservancy and hydropower projects.This paper analyzes the causes of overfilling in anchor cable grouting and foundation grouting construction of water conservancy and hydropower projects,summarizes the experience and problems of previous overfilling control measures,discusses the comprehensive control measures that are more systematic and suitable for bidding stage,and introduces the application effects in several large water conservancy and hydropower projects in China.

关 键 词:水利水电工程 工程管理 招标阶段 灌浆 超灌 管控措施 

分 类 号:TV543[水利工程—水利水电工程] TV512

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象