检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:向潘 张华居 裴佳奕 Xiang Pan;Zhang Huaju;Pei Jiayi
机构地区:[1]中国建筑第二工程局有限公司
出 处:《城市建筑》2022年第S01期88-90,共3页Urbanism and Architecture
摘 要:近年来,我国预应力混凝土管桩的发展尤其迅速,当前我国管桩在品种、生产和其他方面一直居世界前列,生产装备及材料也实现了国产化,相关技术越来越完善。预应力管桩成桩方式多种多样,但是在喀斯特斜岩地貌条件下预应力管桩的成桩率较低,当桩身遇到斜岩层时常常因桩尖咬合岩层能力不足造成桩身折断,无法满足承载力,从而形成废桩。The development of prestressed concrete pipe piles in China has been particularly rapid in recent years.At present,China’s pipe piles have been in the forefront of the world in terms of varieties and output.The production equipment and materials have also been domestically made,and the relevant supporting technologies have become more and more perfect.There are also various ways of forming prestressed pipe piles.However,the pile forming rate of prestressed pipe piles under Karst clinopyrite landform is low.When the pile body meets the inclined rock stratum,the pile body is often broken due to the lack of the ability of the pile tip to bite the rock stratum,and the pile body cannot meet the bearing capacity,thus forming a waste pile.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117