检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周兵[1] 邢琼 ZHOU Bing;XING Qiong(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,Hubei,China)
机构地区:[1]中铁第四勘察设计院集团有限公司,湖北武汉430063
出 处:《隧道建设(中英文)》2021年第S01期388-393,共6页Tunnel Construction
基 金:国家重点研发计划(2016YFC0802205)
摘 要:基于武汉光谷广场综合体项目,在城市中心交通汇集、建筑环绕、场地局限的条件下,为解决平面异形、竖向错层的超大超深基坑修建难题,结合功能需求和空间关系进行分期分区,通过创新支撑体系、BIM可视化应用、临时路面系统托换、支撑毫秒微差延期爆破拆卸等综合技术,实现了城市中心超大超深异形基坑工程的安全优质建造,保障了周边环境和交通安全。The Optics Valley Plaza complex in Wuhan is located in urban traffic concentrated area with numerous surrounding buildings,whose construction site is insufficient.Accordingly,the phased and sectioned construction method is proposed for super-large and-deep special-shaped foundation pit.Through a series of application including innovative support system,building information modeling visualization,temporary road underpinning,and millisecond delay detonation technology,a safe and high-quality construction of a super-large and-deep special-shaped foundation pit in urban center has been built,and the normal running of traffic around the foundation pit has been guaranteed.
关 键 词:超大超深异形基坑 分期分区 水平桁架支撑体系 支撑爆破 BIM
分 类 号:TU753[建筑科学—建筑技术科学] U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3