检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张艳霞 金博文[1] 黄哲文 江锟 ZHANG Yanxia;JIN Bowen;HUANG Zhewen;JIANG Kun(School of Civil and Transportation Engineering,Beijing University of Civil Engineering and Architecture,Beijing 100044,China;Beijing Advanced Innovation Center for Future Urban Design,Beijing University of Civil Engineering and Architecture,Beijing 100044,China;Beijing Higher Institution Engineering Research Center of Structural Engineering and New Materials,Beijing University of Civil Engineering and Architecture,Beijing 100044,China)
机构地区:[1]北京建筑大学土木与交通工程学院,北京100044 [2]北京建筑大学北京未来城市设计高精尖创新中心,北京100044 [3]北京建筑大学工程结构与新材料北京市高等学校工程研究中心,北京100044
出 处:《建筑结构》2021年第S02期828-833,共6页Building Structure
基 金:国家自然科学基金项目(51778036);住房和城乡建设部科学技术计划项目(2017-K9-033);长江学者和创新团队发展计划资助(IRT_17R06)
摘 要:钢结构闭口截面柱的竖向连接通常采用传统的全熔透焊接的方式,该方式存在效率低、成本高、污染重等问题,为解决竖向构件的高效装配难题,提出箱形柱芯筒式法兰连接节点,对芯筒与柱壁间设置塞焊和未设置塞焊的箱形柱芯筒式法兰连接节点进行拟静力试验,通过试验现象、恢复力模型、典型部位应变和法兰连接处螺栓预拉力研究节点的力学性能。研究表明:箱形柱芯筒式法兰连接节点能够在保证节点力学性能的同时实现竖向构件的高效装配,塞焊的设置能够加强芯筒与柱壁间的联系,充分发挥芯筒的作用,减小法兰连接区域应变和法兰板间开口大小,降低螺栓的预拉力损失,改善连接处螺栓群的受力状态,提高节点的刚度和承载力。对于施工现场允许少量焊接的情况,可采用设置塞焊的方式提高节点的力学性能,增加安全储备。The vertical connection of box-shaped section steel columns usually adopt traditional full penetration welding method, which indicates the problems such as low efficiency, high cost and heavy pollution. In order to achieve highly efficient assembly of vertical components, box-shaped column flange connection achieved by core sleevewas proposed.Box-shaped column flange connection achieved by core sleeve with plug welding and without plug welding were designed to conduct the pseudo-static tests. The test phenomenon, the restoring force model, the strain of typical position and the pretension of high strength bolts at the flange connection are embodied and analyzed to explore the mechanical properties of the connection. The tests results show that box-shaped column flange connection achieved by core sleeve can realize the efficient assembly of vertical members as well as ensure the excellent mechanical properties of the connections. The setting of plug welding could strengthen the connection between the core sleeve and the column wall,make the core sleeve work at full capacity, reduce the strain and deformation of the flange connection, reduce the pretension loss of the bolts, and hence improve the force state of the bolt group, and increase the stiffness and bearing capacity of the connection. When a small amount of welding is allowed on the construction site, plug weld can be used to improve the mechanical performance and simultaneously increase the safety reserve.
关 键 词:箱形柱芯筒式法兰连接节点 塞焊 力学性能 拟静力试验
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229