检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:樊文林 黄再坚 FAN Wenlin;HUANG Zaijian(Guizhou Water Conservancy&Hydropower Survey&Design Research Institute CO.LTD.,Guiyang 550001,China)
机构地区:[1]贵州省水利水电勘测设计研究院有限公司,贵州贵阳550001
出 处:《河南水利与南水北调》2022年第7期36-37,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:针对山区高扬程、长距离输水工程,因受征地、移民、压矿、生态环境、地质条件等影响,挡水大坝址往往地处高山峡谷区,左右岸地形一般较陡,对外交通条件较差,对泵站的选型和取水方案设计带来了较大的挑战。文章以某中型水利工程为例,主要探讨高山峡谷地区中水利工程泵站不同取水方案,在技术可行、安全可靠前提下,以财务指标最优确定最优方案。Due to the influence of land expropriation,migration,mining pressure,ecological environment,geological conditions,etc.,the dam site of water retaining is usually located in the mountain valley,and the terrain on the left and right banks is generally steep and the external traffic condition is poor,which brings great challenges to the selection of pumping stations and the design of water intake schemes.Taking a medium-sized hydraulic engineering as an example,the different water intake schemes of hydraulic engineering pumping station in the high mountain and gorge area are mainly discussed in this paper.Under the premise of technical feasibility,safety and reliability,the optimal scheme is determined by the optimal financial index.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.39.45