检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘晓东[1] LIU Xiaodong(China Railway Shanghai Design Institute Group Co.,Ltd.,Shanghai 200072,China)
机构地区:[1]中铁上海设计院集团有限公司,上海200070
出 处:《高速铁路技术》2020年第S01期68-71,共4页High Speed Railway Technology
摘 要:连镇铁路选取综合路基DK149+500~DK154+450段开展BIM试点工作,整个里程含宝应车站1座,包含地质、测量、轨道、线路、站场、路基、桥梁以及接触网、通信信号、环保等专业。站场专业在试点研究中采用Autodesk软件平台,初步总结了铁路站场设计领域的BIM设计流程,研究了站场与相关专业的联系,为更好利用BIM技术服务站场设计积累经验。Lianyungang-Zhenjiang railway selects DK 149+500~DK 154+450 sections of comprehensive subgrades to carry out BIM pilot work.The entire mileage has Baoying station,including geology,survey,track,line,station,roadbed,bridge and catenary,communication signals,environmental protection,etc.so as to accumulate experience for better using BIM technology to serve the station design in the pilot study,the station specialty uses the Autodesk software platform to preliminarily summarize the BIM design process in the field of railway station design,researches the connection between the station yard and related majors to accumulate`experience for better use of BIM technology to serve station design.
分 类 号:U291[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249