Reduce Slurry Leakage at Joints between PC Composite Slabs and Cast-in-place Beam Slabs  

在线阅读下载全文

作  者:ZHANGQianlu LIShijun LIUXinping ZHOUChichen YANZhiyang 

机构地区:[1]ChinaConstructionFifthEngineeringBureauCo.,Ltd.,Hangzhou310000,China

出  处:《外文科技期刊数据库(文摘版)工程技术》2022年第1期225-232,共8页

摘  要:The construction site of this project is located at the southeast corner of the intersection of Tonghui South Road and Nanxiu Road in Xiaoshan District of Hangzhou City, with a construction land area of approximately 43890 m2, a construction floor area of 26115 m2, a tentative total construction area of 233715m2, and an above-ground total construction area of approximately 131790 m2 (including approximately 100000 m2 of commercial buildings, approximately 7330m2 of office buildings and approximately 24460m2 of Jinjie commercial buildings). The total construction area of the third underground floor is approximately 101925m2 (of which, the first underground floor is approximately 43040 m2, the second underground floor is approximately 38935m2, and the third underground floor is approximately 19950m2 (of which, the air defense area of the basement is approximately 7500m2)).

关 键 词:PC laminated board cast-in-place beam slab JOINTS slurry leakage 

分 类 号:TB[一般工业技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象