检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:HUSenHEMingjiang XINWenyuan SUYu
机构地区:[1]AviationIndustryShaanxiAircraftIndustryCo.,Ltd.,HanzhongShaanxi723213,China
出 处:《外文科技期刊数据库(文摘版)工程技术》2022年第4期182-187,共6页
摘 要:In order to predict the fixed man hour with process as the basic unit in the process of aircraft final assembly, a man hour quota method based on the field measured data is proposed by using 1511 quantity quota. Using this optimization method, the fixed man hour of aircraft final assembly is predicted through the historical actual man hour data The example verification results show that this method fits well, can better solve the problem of difficult formulation of fixed man hours in the process of aircraft assembly, and provides a strong basis and guarantee for formulating reasonable project plan and cost control in the process of aircraft development. This paper introduces the difficulties and problems existing in the man hour quota in the aircraft final assembly stage of Shaanxi airlines. Guided by the problems and combined with the production characteristics of the final assembly link, this paper puts forward a new "1511" man hour quota method, comprehensively plans the factors affecting the man hour quota from seven dimensions, and establishes a standard database to standardize, standardize and scientific the man hour quota, It provides a certain reference for the improvement of basic management in the same industry.
关 键 词:1511 time quota management improvement
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.78.139