检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHANGPengyong
机构地区:[1]Shandong Urban Construction Design Institute, Ji’nan 250000, China
出 处:《外文科技期刊数据库(文摘版)工程技术》2022年第4期081-085,共5页
摘 要:In recent years, with the acceleration of urbanization progress, the rapid growth of urban sewage volume, urban sewage treatment plants generally show overload operation, scale expansion and quality and efficiency improvement have put forward incremental demand for its construction land. With the development of the city, the original planned sewage treatment plants located in the town edge or the suburbs are mostly gradually surrounded by new construction and development land, and the expansion is restricted. Underground sewage treatment plant has the advantages of land saving, environmental protection, small ground dirty gas and noise, and small impact on the ground landscape, which provides an effective way to alleviate the construction land shortage of urban sewage treatment plants in China. However, underground sewage treatment plants also have inherent disadvantages in flood control and drainage, such as entrance and exit, equipment lifting other exposed space, easy to cause flood pouring, becomes the key and difficult point of urban flood control and drainage;through the inlet pipe connected with urban sewage pipe network (or confluence sewage pipe network) overflow is easier to directly cause underground urban sewage treatment plant flooding, causing serious accidents and serious environmental pollution. Based on this, this article studies the key points and difficulties of structural design of underground sewage treatment plant for reference.
关 键 词:underground sewage treatment plant structural design key points difficult analysis suggestions
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145