检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:LIUYanqian
机构地区:[1]SinopecJianghanPetroleumEngineeringCo.,Ltd.,QianjiangHubei433100,China
出 处:《外文科技期刊数据库(文摘版)工程技术》2022年第6期121-128,共8页
摘 要:Aiming at the problems of deep shale gas wells in Baima Block of Fuling Shale Gas Field, such as deep burial, complicated geological structure, frequent leakage, low penetration rate and low cementing quality rate, the difficulties in drilling and completion of deep shale gas in Baima Block are summarized based on the analysis of the geological characteristics of the block and the previous drilling and completion data. Through the technical research of differential wellbore structure optimization, sectional wellbore trajectory control, personalized PDC bit design, anti-high temperature leak-proof and plugging drilling fluid technology and narrow safety window cementing technology, A set of fast drilling and completion technology suitable for deep shale gas in Baima Block has been formed and applied in this block for 15 wells, with the average penetration rate increased by 41.95% year on year, the drilling cycle shortened by 30.40%, and the cementing quality rate increased by 10%. The application effect is good. The technology can be popularized and applied as fast drilling and completion technology for deep shale gas in Baima Block.
关 键 词:deep shale gas well well structure optimization sectional trajectory control personalized PDC bit leak-proof drilling fluid narrow window cementing
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.58.166