检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:JIAWanshuai
机构地区:[1]China Railway 14th Bureau Group Fifth Engineering Co., Ltd., Ji’ning Shandong 272100, China
出 处:《外文科技期刊数据库(文摘版)工程技术》2022年第7期203-207,共5页
摘 要:Aiming at the problems of low mechanization degree, high labor intensity and slow construction progress in traditional drilling and blasting construction, this paper takes Yongxing No.1 Tunnel as the engineering background, analyzes its construction organization scheme, mechanized tooling operation matching method and standardized management of process construction, and puts forward a set of tooling matching technology and standardized control scheme for drilling and blasting tunnel construction. The practice results show that, compared with the conventional drilling blasting method, the rapid construction with tooling can significantly improve the project progress, save the production cost and reduce the construction risk. Implementing standardized control of working procedures can significantly reduce the time required for each working procedure;With the combination of tooling design and process standardization control, the construction period of Class III surrounding rock section of Yongxing No.1 Tunnel is 58.5h shorter than that of the traditional construction method, which has achieved good social and economic benefits and realized the rapid and safe construction of Yongxing No.1 Tunnel.
关 键 词:high-speed railway tunnel tooling matching process standardization
分 类 号:U4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63