Problems and Countermeasures of Procurement Management in Petrochemical Project  

在线阅读下载全文

作  者:LIShuting 

机构地区:[1]Sinopec Guangzhou Engineering Co., Ltd., Guangzhou 510620, China

出  处:《外文科技期刊数据库(文摘版)工程技术》2022年第7期154-157,共4页

摘  要:In petrochemical engineering projects, due to the characteristics of large construction scale, long project cycle, large capital investment, the public procurement work cycle is short. In order to promote the normal operation of the project, we need to pay attention to the procurement link, run the procurement throughout the project, strengthen the quality control of materials and equipment, make it meet the unified national standards, and meet the actual requirements of the project. On this basis, we also need to control the cost of the project. Combined with the winning characteristics of petrochemical engineering projects, this paper analyzes the shortcomings of winning the bid of petrochemical engineering projects, and puts forward the countermeasures to optimize the contract management of petrochemical engineering projects.

关 键 词:petrochemical engineering project procurement management management measures 

分 类 号:F426.7[经济管理—产业经济] F423.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象