检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:JIQingfeng
机构地区:[1]XinjiangBeixinRoadandBridgeGroupCo.,Ltd.,Urumqi830000,China
出 处:《外文科技期刊数据库(文摘版)工程技术》2022年第7期101-106,共6页
摘 要:In the construction of cast-in-place section of side span of continuous rigid frame bridge, traditional construction methods such as landing support method and steel pipe column method are adopted. When the height of side pier is high, it is difficult, dangerous and uneconomical to cast-in-place construction with ordinary support, and the elastic deformation of support is too large to guarantee the concrete pouring quality of side span cast-in-place section. The steel pipe column method also has some construction problems such as difficult foundation treatment and difficult mechanical installation. After repeated discussion, this problem can be solved by using the cantilever support of the erected beam section of the approach bridge for construction. In the construction of cast-in-place section of continuous rigid frame bridge beam side span, the bracket method is generally adopted, which is difficult, dangerous and uneconomical in the case of high piers. This problem can be solved by using the cantilever bracket erected at the erected beam section of the approach bridge for construction.
关 键 词:side span cast-in-place section cantilever bracket TECHNOLOGY
分 类 号:U44[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15