Difficulties and Solutions in Boundary Survey and Pile Fixing of Guanting Reservoir  

在线阅读下载全文

作  者:CHENYueping LUJinzhong XIEJianzhi JIANGYuhang HANXu 

机构地区:[1]Beijing Guanting Reservoir Management Office, Zhangjiakou Hebei 075441, China

出  处:《外文科技期刊数据库(文摘版)工程技术》2022年第9期125-129,共5页

摘  要:In order to implement the development concept of "green water and green mountains are golden mountains and silver mountains", promote the integrated and coordinated development of Beijing, Tianjin and Hebei, and promote the protection and restoration of the Guanting Reservoir ecosystem, the basic project of cross regional ecological environment governance was implemented. This paper introduces the formulation of the scheme. In view of the problems and difficulties in the project implementation, it gradually explores solutions in practice, and forms a multi measure system with the government as the leading force, departments as the linkage and implementation at all levels, which ensures the smooth implementation of the project.

关 键 词:guanting reservoir demarcation and pile fixing DIFFICULTIES SOLVE THINKING 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象