Brief Discussion on the Owner's Core Function under PM Authorization —— Taking the Practice of Phase II Project of Changzhou Institute of Technology as an Example  

在线阅读下载全文

作  者:SUKang 

机构地区:[1]Changzhou Institute of Technology, Changzhou Jiangsu 213003, China

出  处:《外文科技期刊数据库(文摘版)工程技术》2022年第9期083-087,共5页

摘  要:Combined with the content of the five responsible parties system, this paper probes into the core function of the owners project management and analyzes its existing problems with engineering cases. Taking phase II project construction of Changzhou Institute of Technology as an example, this paper briefly describes the project overview, analyzes the authorization of the owners representative and the core functions of the owner and proposes that the supervision and assessment of the owner to the PM should be strengthened when the PM is introduced to achieve the balance of responsibilities and rights.

关 键 词:construction project owner's representative core function five responsible parties system 

分 类 号:TU71[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象