Analysis of Measurement and Valuation Management of General Contract of Water Conservancy Project Led by Construction Unit  

在线阅读下载全文

作  者:LIYongfeng 

机构地区:[1]Powerchina Harbour Co., Ltd., Tianjin 300467, China

出  处:《外文科技期刊数据库(文摘版)工程技术》2022年第9期058-062,共5页

摘  要:Based on the design and construction general contracting bidding and contract management of the second phase project (pumping station and rubber dam project) of Jiaodong Peninsula strategic water source improvement and capacity increase project, this paper analyzes the characteristics of contract metering and pricing management under the general contracting project mode of water conservancy project led by the construction unit, expounds the advantages and existing problems in metering and pricing management of water conservancy project and puts forward relevant suggestions for the general contracting management of water conservancy project led by the construction unit.

关 键 词:water conservancy industry construction lead general contracting measurement and valuation manage 

分 类 号:TU723.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象