检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北大学电信系,邯郸师专
出 处:《河北大学学报(自然科学版)》1994年第4期55-58,共4页Journal of Hebei University(Natural Science Edition)
摘 要:电力资源紧张,管理手段落后是我国电力行业的现状。为了缓解电力能源紧张,改变落后的管理手段,在原来定量器、定时器等电力负荷控制装置的基础上,我们研制开发了具有后台管理功能和在网络环境下适行的DKF-电力负荷控制装置。有效地解决了限电不拉路,改变了落后的管理手段。he shortage of electric power and the backward measures of managerentare the present situation in power’s industry of our country. To relax the shortage of elec-tric power and change the backward measures of management, we manufactured and de-veloped the controlling device of load of electricity. This is a unit with function of backstagemanagement, which can run under the Network condition. Limiting electricity consumebut not cutting off its supply is effectively solved,moreuer, the backword measures ofmana...
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229