作 者:朱康[1] 陈宝喜[1] 庞晓艳[2] 刘柏私[1] 范荣全 李世平[4]
机构地区:[1]四川电力试验研究院,四川成都610072 [2]四川电力调度中心,四川成都610041 [3]四川省电力公司,四川成都610041 [4]自贡电业局,四川自贡643000
出 处:《四川电力技术》2007年第S1期38-39,64,共3页Sichuan Electric Power Technology
摘 要:为提高川电东送输电通道的输电能力,四川500 kV洪沟变电站配置了国产第一套SVS系统。四川省电力公司首次在川电外送通道上的二普Ⅲ线C相普提侧分别进行了两次瞬时人工接地试验以检验洪沟SVS系统在电网发生大扰动后的动作行为。对两次试验中洪沟SVS行为进行分析并进行了实时数字RTDS仿真。In order to improve the transmission ability of the transmission path from Sichuan to East China,a set of Static Var System(SVS) was installed in 500kV Honggou Substation of Sichuan which was the first one produced in China.Instantaneous single phase to ground short tests at C phase of Er-Pu III line close to Puti are carried out twice by Sichuan Electric Power Corporation to verify the control action of SVS in Honggou Substation for the first time.The control action of SVS in Honggou is introduced,analyzed...
分 类 号:TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42