大跨度隧道单—双侧壁导坑法施工力学分析  被引量:11

Construction Mechanics Analysis of One-Cheek and Two-Cheek pilot Method of Large Span Tunnel

在线阅读下载全文

作  者:汪立新 

机构地区:[1]中铁十九局集团第二工程有限公司,辽宁辽阳111000

出  处:《西部探矿工程》2007年第10期170-173,共4页West-China Exploration Engineering

摘  要:结合某大跨度四车道隧道建设,通过单、双侧壁导坑法动态施工过程的弹塑性有限元数值模拟,对隧道Ⅳ级围岩段的围岩-支护结构体屈服接近度、位移和应力特征进行了比较分析,提出了该隧道较优的施工方法。为类似地质条件下的大跨度隧道设计和施工提供了科学依据。Combined a large span four lane tunnel building,characteristics of approach yield degree,displacement and stress of tunnel surrounding rock-support structure body in Ⅳ class surrounding rock plat have been comparative analyses through elasto-plastic finite element numerical modeling of one-cheek and two-cheek pilot method dynamic excavation process.The optimized construction method of tunnel has been put forward in this paper.The study provided science foundation for similar geo-condition large span tunnel design and construction.

关 键 词:大跨度隧道 侧壁导坑法 数值模拟 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象