检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑家朋[1] 骆洪梅[1] 马静荣 张杰[2] 郑贞[1]
机构地区:[1]冀东油田公司钻采工艺研究院,河北唐山063000 [2]冀东油田公司南堡作业区,河北唐海063200
出 处:《石油钻采工艺》2007年第z1期71-74,共4页Oil Drilling & Production Technology
摘 要:针对复杂断块边底水驱油藏含水上升快、多轮次调剖费用高的问题提出了可动凝胶调驱技术。通过数值模拟和物理模拟研究,确定了最佳注入井网、注入方式、注入段塞尺寸以及不同开发方式提高采收率潜力与经济效益关系。研究表明,4口井注入井网的见效井较多,提高采收率32.2个百分点,注入相同PV数情况下2口井注入井网见效井较少,提高采收率28.7个百分点;多级段塞注入方式提高采收率幅度高于单段塞注入方式;在非均质严重的油藏,在实施可动凝胶调驱前有必要进行先期调剖,调剖后可动凝胶调驱开发油藏最终提高采收率26.01个百分点,而可动凝胶调驱开发油藏可最终提高采收率23.15个百分点。该技术可提高边底水驱油藏开发效果。Technology of cross-linked polymer drive control presented according to the problems of water percentage rising quickly and high expense of multi-cycle profile control in edgy and bottom water driving reservoir of complex fault block. Through simulation research of value and physical, the best injection well network, injection way, injection slug size as well as the relations between enhancing recovery rate potential in different development way and the economic efficiency are determined. The findings indicated that, four-well injection network has more operated well than two-well injection network, recovery rate of the former increased by 32.2% while that of the latter increased by 28.7%, on the same injection PV numbers condition, multistage slug injection way is higher than one slug injection pattern in enhancing recovery rate, In serious heterogeneous reservoir, preceding profile control is necessary before cross-linked polymer implementation because recovery rate is increased by 26.01% by cross-linked polymer drive after profile control while recovery rate is increased by 23.15% by that without profile control. The research indicates that the technology may enhance development effect of the edgy and bottom water drive reservoir.
分 类 号:TE357.4[石油与天然气工程—油气田开发工程] TE349
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.139.13