机构地区:[1]中交水运规划设计院,北京100007 [2]同济大学,上海200092 [3]上海港务工程公司,上海200438
出 处:《工业建筑》2007年第z1期848-851,共4页Industrial Construction
摘 要:上海港罗泾港区地基处理工程,对地基承载力要求高,工期要求紧。结合实际工程情况,针对吹填细砂与下卧软黏土的工程性质,对强夯-降水联合法在此类地基条件下的适用性进行了试验研究,对加固过程以及加固后的土体变形、超静孔压变化、加固效果和加固后土体的时间效应以及强夯的加固机理进行了分析。在试验的基础上,确定了强夯施工工艺的施工参数,得到了一些有益的结论,对类似工程有一定的借鉴意义。According to Shanghai harbor ground treatment project,considering the engineering properties of fine sands and disturbed soft soils underlying it,dewatering combining with dynamic consolidation for strengthening the disturbed soft soils underlying the hydraulic silty and fine sands is introduced,and soil deformation,pore pressure,time effect of soft clay strength have also been analyzed.On the basis of results of field tests,construction parameters are determined.In the end,some useful conclusions are obtained,which will be a reference for other similar projects.
分 类 号:U655.54[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43