弯剪受力下预埋件与后锚固连接设计方法的比较  被引量:4

DESIGN COMPARISON OF CAST-IN-PLACE AND POST-INSTALLED ANCHORAGE CONNECTIONS UNDER COMBINATIONS OF MOMENT AND SHEAR LOADING

在线阅读下载全文

作  者:邴涛[1] 谢群[2] 

机构地区:[1]山东天柱建设监理咨询有限公司,聊城252000 [2]济南大学,济南250022

出  处:《工业建筑》2007年第z1期280-282,共3页Industrial Construction

摘  要:分析了弯剪作用下预埋件与后锚固两种锚固方式的设计特点,通过一个工程算例的计算结果比较可知,后锚固设计中当考虑全部锚筋参与受剪时,可充分发挥锚筋强度,而且与预埋件设计结果具有可比性。预埋件设计较全面地考虑了多种因素对承载力的影响,对后锚固连接设计有借鉴意义。Design methods of two types of steel-to-concrete connections under combinations of moment and shear loading,cast-in-place anchorage and post-installed anchorage,are discussed.The calculation results of an example are used to draw the conclusion that in post-installed anchorage design steel reinforcements could develop their full strength with the assumption that all bonded-in reinforcements take up shear loads and the two types of anchorage connections have comparable results.In design method of cast-in-place reduction factors that effect the strength have been included,which give good advice to post-installed anchorage design.

关 键 词:预埋件 后锚固 弯剪受力 化学植筋 

分 类 号:TU378[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象