密集建筑区域中深基坑全逆作法的设计与实践  被引量:35

Design & Practice of Deep Foundation Pit Constructed by Top-down Method in Dense-constructed Area

在线阅读下载全文

作  者:戴斌[1] 王卫东[1] 徐中华[2] 

机构地区:[1]华东建筑设计研究院有限公司,上海200002 [2]上海交通大学土木工程系,上海200030

出  处:《地下空间与工程学报》2005年第4期579-583,共5页Chinese Journal of Underground Space and Engineering

基  金:上海科学技术委员会资助课题(04dz12001)。

摘  要:上海兴业银行大厦基坑周边建筑密集、管线众多,环境保护要求很高,文章详细介绍了该基坑工程的支护设计过程,包括全逆作法的总体设计方案、“两墙合一”的地下连续墙设计、水平支撑体系设计、竖向支承体系设计和坑内外加固设计;并对主要的监测结果作了分析。该基坑工程已顺利完成,设计方案的实施有效地保护了基坑周边的敏感环境。The foundation pit of Shanghai Xingye Bank Building is surrounded with a lot of buildings. Protection of the surrounding environment is very strict as many underground utilities such as telephone, gas and drainage pipelines distributed around the excavated site. This paper introduces the design process of the foundation pit supporting in detail. The top-down method is adopted in the overall design scheme which includes the design of the diaphragm wall, the horizontal strutting system, the vertical propping system, and the reinforcement countermeasures both in and out the foundation pit. Further more, the main monitored results are also discussed. The successful accomplishment of the foundation pit has effectively protected the surrounding environment.

关 键 词:深基坑 逆作法 设计 密集建筑区域 

分 类 号:TU473.2[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象