三峡船闸输水系统混凝土质量检查处理  被引量:1

Quality check and treatment for concrete of TGP shiplock water filling and emptying system

在线阅读下载全文

作  者:孙峰[1] 李旭辉[2] 

机构地区:[1]武警水电三峡工程指挥部,湖北宜昌443133 [2]中南勘测设计研究院,湖南长沙410014

出  处:《人民长江》2008年第7期8-10,90,共4页Yangtze River

摘  要:三峡双线船闸地下输水系统结构设计复杂,由平、斜、竖隧洞和竖井错落相贯构成了庞大的地下洞室群,施工历时4 a共完成混凝土浇筑59.18万m3。确保混凝土质量优良对双线船闸的正常运行有至关重要的作用,为更好地检查混凝土的内部浇筑质量,采取了混凝土无损检测的措施,并结合检测结果进行钻孔取芯检查。The underground water filling and emptying system of TGP double lane shiplock is complicated in structure, and the various tunnels and shaft well form a huge underground cavity group. The construction underwent 4 years with grouted concrete of 591.8 thousand m3 . The concrete quality has an important role in operation of the shiplock. In order to well check internal concrete quality, non-destructive check measures was taken and testing and verifying were conducted by core boring.

关 键 词:地下输水系统 混凝土质量 检查处理 三峡双线船闸 

分 类 号:U641.32[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象