750kV电气设备现场交接及预防性试验技术研究  被引量:3

Technical Research on Site Hand-over & Preventive Test of 750kV Electric Equipment

在线阅读下载全文

作  者:朱跃[1] 王莉英[2] 陈楚羽[2] 

机构地区:[1]西北电网有限公司,陕西西安710028 [2]陕西电力科学研究院,陕西西安710054

出  处:《陕西电力》2006年第5期13-18,共6页Shanxi Electric Power

摘  要:为满足750 kV超高压电气设备现场安装后的质量检验和电网运行需要,提出了750 kV电气设备现场交接及预防性试验技术研究;制定了750 kV超高压电气设备交接试验标准、750 kV超高压电气设备预防性试验规程;提出了750 kV超高压电气设备现场试验设备技术参数研究报告,编写了750 kV超高压电气设备交接试验标准及预防性试验规程编制说明。For meeting the demands of quality check and network operation after site erection of 750kV UHV electric equipment, this paper proposes the technical study on site hand-over & preventive test of 750kV UHV electric equipment, formulates the code of site hand-over test of 750kV UHV electric equipment, and that of preventive test. This paper put forwards the site test equipment technical data research report of 750kV UHV electric equipment, compiles the explanation of hand-over test standard and preventive test code of 750kV UHV electric equipment.

关 键 词:750 KV输变电工程 交接试验 预防性试验 技术研究 

分 类 号:TM83[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象