陇海铁路宝天段增建第二线55次跨越渭河地质原因分析  被引量:3

THE GEOLOGICAL REASON ANALYSIS OF BAOTIAN SECOND RAILWAY STRIDING ACROSS WEIHE RIVER FOR 55 TIMES

在线阅读下载全文

作  者:车晓明[1] 

机构地区:[1]铁道第一勘察设计院,甘肃兰州730000

出  处:《铁道工程学报》2005年第z1期192-197,共6页Journal of Railway Engineering Society

摘  要:建国前修建的宝天铁路是严重的病害铁路。号称陇海铁路的"盲肠",主要受渭河区域性大断层的影响,沿线滑坡、泥石流等病害发育。增建二线绕避严重不良地质区,选择渭河两岸的有利地形、地质条件,通过几个实例,说明线路多次跨越渭河是恰当的。The Baotian railway called‘caecum’ of Longhai railway is a serious lesion railway before the PRC founding,which well-developed landslides and dobris flows.It was also influenced by regional faults of Weihe river.The Baotian second railway detoured and bypassed the serious poor geological section.The arti- cle explained the railway line stride across Weihe river for many times by several living examples,which se- lected the advantage landscape and geological condition along both Weihe river sides.

关 键 词:区域断层 工程地质选线 不良地质 滑坡 

分 类 号:U212[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象