检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邬喆华[1] 何丽波[2] 许国平[2] 楼文娟[3] 刘占海[4]
机构地区:[1]同济大学土木工程学院,上海200092 [2]宁波市建筑设计研究院科研所,宁波315010 [3]浙江大学建筑工程学院,上海200092 [4]上海建通工程建设咨询监理有限公司,上海200030
出 处:《工业建筑》2005年第z1期763-766,776,共5页Industrial Construction
摘 要:镇海仓库采用大跨预应力混凝土框架结构。主要对三层两跨预应力混凝土框架进行了考虑张拉施工方案的计算分析。结果表明,现行设计法所得的预应力综合弯矩和预应力次弯矩与实际值有较大的偏离。为保证按逐层法施工时现行设计法能满足框架控制截面的抗裂和承载能力要求,提出了修正方法。Construction process of multi-story prestressed concrete frames(MPCF)should be noted in structural analysis because the sequence of steel tension and concrete pouring directly affects building mechanical model.But in general it is not considered during designing MPCF.The calculated model of the main platform in the Zhenghai Storehouse is analyzed with the construction process taken into account.The key site is reinforced in order to satisfy the requirement of cracking capacity and bearing capacity of prestressed frame.
分 类 号:TU757[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28