综放工作面端面顶煤破坏机理及冒顶治理  被引量:2

Top coal failure mechanism and top coal falling control at front of fully mechanized longwall top coal caving mining face

在线阅读下载全文

作  者:董立红[1] 刘社育[1] 

机构地区:[1]中国矿业大学(北京)资源与安全工程学院

出  处:《煤炭科学技术》2008年第2期9-11,共3页Coal Science and Technology

摘  要:采用现场观测及计算机数值模拟计算方法,研究综放工作面端面顶煤冒顶机理,得出后端面顶煤冒顶的主要影响因素是端面距大小、片帮范围和支架的初撑力,控制端面煤壁片帮是控制顶煤冒顶的有效措施。现场应用表明,在综放面向端面煤体打木锚杆是控制煤壁片帮的有效手段,通过实施该措施,端面煤岩体平均冒落高度由3.5 m下降到0.8 m,取得了显著的经济技术效益。With the site observation and the computer numerical simulation calculation method,the paper studied the top coal falling mechanism at the front of the fully mechanized longwall top coal caving mining face.The main affected factors of the top coal failing at the rear of the front face obtained were the distance of the front face,coal wall spalling area and the initial support force of the hydraulic powered support.The coal wall spalling control is the effective measure to control the top coal falling.The si...

关 键 词:综放开采 顶煤稳定性 数值模拟 端面距 

分 类 号:TD823.49[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象