雨水调蓄池与苏州河市政泵站排江污染削减分析  被引量:5

PAINWATER STORAGE TANK AND THE ANALYSIS OF SUZHOU CREEK MUNICIPAL PUMP STATION OVERFLOWS POLLUTION REDUCTION

在线阅读下载全文

作  者:郭晟[1] 程江[2] 吕永鹏[2] 

机构地区:[1]华东师范大学环境科学系,上海200062 [2]上海市城市化生态过程与生态恢复重点实验室,上海200062

出  处:《内蒙古环境科学》2008年第2期81-83,共3页Inner Mongolia Environmental Protection

摘  要:雨天苏州河延岸市政泵站的排江污染是造成苏州河水质不稳定的原因之一,在兼顾防汛与截污的基础上,对延岸大泵站建设雨水调蓄池是削减苏州河排江污染负荷的重要工程,通过对成都路调蓄池试运行研究,估算每年可削减成都路泵站排江量50%以上,削减CODcr 11.53吨、SS 4.76吨。In rainy days,the overflow pollution of municipal pumping stations along Suzhou creek is one of the reasons for instablility of Suzhou creek water quality.In the balance with the interception flood and prevention pollution,building rainwater storage tank is to reduceoverflow pollution load is an important works measure.By testing the Chengdu Road storage tank running,it is estimated annual pollution volume reduction of Chengdu Road Pump Station overflow decreased more than 50%,CODcr 11.53 tons,SS 4.76 tons.

关 键 词:雨水调蓄池 排江量 污染削减 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象