大亚湾核电站RRI/SEC热交换器压差高问题的处理  被引量:3

Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station

在线阅读下载全文

作  者:曹智鹏[1] 张朝文[1] 戴忠华[1] 王勤湖[1] 

机构地区:[1]大亚湾核电运营管理有限责任公司,广东深圳518124

出  处:《核动力工程》2005年第S1期120-122,共3页Nuclear Power Engineering

摘  要:采用根本原因分析法(RCA),应用故障模式分析矩阵,对大亚湾核电站RRI/SEC热交换器频繁出现压差高这一故障的原因进行了分析,并通过试验验证,最后确定了RRI/SEC热交换器故障的根本原因。采用修改SEC系统的加药方式,很好地解决了故障问题。经过两年的运行验证,曾出现压差高的8台热交换器运行状况良好,压差值已控制在设计范围内。This paper have analyzed the reason of high pressure difference of RRI/SEC heat exchanger inDaya Bay nuclear power station,by adopting the Root Cause Analysis method(RCA) and the analysis matrixof failure mode.After few experiments have been done on the SEC system,we confirm the reason of theexchanger failure.Through modifying the method of adding chemicals to SEC system,the exchanger failureis solved satisfactorily.Two years of operation indicate that the 8 exchangers ever with failure can operatesatisfact...

关 键 词:SEC系统 RRI系统 热交换器 压差高 海生物 

分 类 号:TL353[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象