检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西藏电力公司昌都金河电站工程建设指挥部,西藏昌都854000
出 处:《水利水电技术》2004年第S1期19-20,22,共3页Water Resources and Hydropower Engineering
摘 要:GIS全封闭组合电器首次在西藏高原地区采用,它改善了恶劣环境对电气设备的危害,有利于今后的运行管理,提高了电站综合自动化水平.阐述了GIS设备现场试验的重要性和试验项目,以及GIS设备现场试验对金河电站可靠运行的意义.GIS full-enclosed combined electric installations have been applied for the first time to the areas of Tibet Plateau. These installations permit to accommodate themselves to adverse circumstances, to favour the future exploitation and management , and to improve the level of automation of the station. The great importance of on-site testing for the GIS installations and their testing items, as well as the significance of testing for Jinhe Hydropower Station are described in this article.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.126.184