检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学机械与材料学院
出 处:《广东输电与变电技术》2008年第3期43-46,共4页Guangdong Power Transmission Technology
摘 要:介绍了目前常用的带电跨越架线方法,从技术性、经济性、可靠性、可操作性、环保性五方面对输电线路带电架线影响因素进行分析,阐述了其工作原理和应用范围。并在此基础上,对三类带电跨越方法进行了比较分析,总结优缺点,指出其发展方向,为带电跨越方案的设计和施工提供了参考。This paper introduces the stringing method for common living crossed power transmission line during erection. According to its requirement,analyzes influence factors from five aspects,they are:technique,economy,reliability,operating and environment protection,expatiate its operating principle and application scope.Based on it,three kinds of living across methods have been analyzed and compared,the advantage and disadvantage of them have been summarized.Finally,the developing way is indicated for reference of design and construction.
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28