检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:俞雪飞
出 处:《工业建筑》2008年第z1期411-414,共4页Industrial Construction
摘 要:丹东港全民健身中心游泳馆工程为三层框架结构,一层为普通混凝土框架梁,二层采用跨度为29 m的预应力混凝土梁,三层为65 m×37 m网架。对结构材料选用,预应力工艺选择,内力计算及有关节点设计进行了分析和介绍,可供类似工程参考。The concrete frame structure is used for the natatorium of Dandong Port Public Fitness Center.The first floor beams are ordinary concrete frame beams and 29 metre-span prestressed concrete beams are used on the second floor,and a space latticed frame of 65 metre long and 37metre wide covers this building.The following problems in designing these frames are analyzed and presented: how to determine the material of the frame;prestressing techniques;stuctural analysis as well as how to calculate the internal force,which can givea refrence to the similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.64