作 者:陈少雄[1] 彭翠芳[2] 何志刚[1] 刘武宏[1] 代泽兵[3]
机构地区:[1]湖南省电力勘测设计院,湖南长沙410007 [2]长沙理工大学,湖南长沙410077 [3]国网北京电力设计研究院,北京102401
出 处:《武汉大学学报(工学版)》2008年第S1期156-160,共5页Engineering Journal of Wuhan University
摘 要:介绍了某发电厂660 MW汽轮发电机采用上海汽轮机厂引进西门子技术汽轮机和上海发电机厂引进西屋技术发电机基础的设计.首次将该类型西门子机型基础横向框架跨度尺寸进行了压缩优化.应用有限元软件ANSYS、MFSAP对基础进行了动力分析,并与本基础1∶10物理模型试验结果进行了比较.结果表明,本基础各项性能指标均满足现行规范要求,可供类似工程参考、借鉴.Design of a foundation of 660 MW turbo-generator manufactured by Shanghai Turbine-Generator Factory with import technology of Siemens and Westinghouse is described.The cross frame of the foundation was shortened to optimization as for the first time the domestic foundation of Siemens-model turbo-generator adopted.Dynamical analysis of the foundation was proceeded using finite element software such as ANSYS and MFSAP,and were compared with the 1∶10 physical model test.The results show that the all performanc...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229