PDCA循环在蒸汽发生管生产中的应用  被引量:2

Application of PDCA Circulation in Quality Control for Production of Steam Generator Pipe

在线阅读下载全文

作  者:李斌[1,1] 王建[1] 王永强[1] 何静[1] 李红军[1] 李淑容[1] 

机构地区:[1]中国核动力研究设计院核燃料元件及材料研究所,成都610041

出  处:《核动力工程》2008年第S1期7-9,共3页Nuclear Power Engineering

摘  要:在钛合金蒸汽发生管的焊接生产中,通过运用策划、实施、检查、处置(PDCA)模式进行质量控制管理,有效地控制了焊接缺陷,焊缝合格率稳步上升,达到90%以上,实现了预期质量目标。实验和工程应用结果证明,按照PDCA循环进行过程控制,可以保证影响质量的每一活动都得到有效控制而无遗漏,形成稳定可靠的生产工艺,不断提高产品质量。PDCA Circulation (Plan, Do, Check, Action) is applied in quality-control management during the welding process of Titanium alloy steam generator pipe. The weld defects is controlled effectively and the ratio of certified weld rose steadily, which achieve its target( 90%). Experiments and engineering application show that, if the process-control could be carried out according to the PDCA circulation, activity which affect quality could be ensured to be controlled effectively without being omitted, and finall...

关 键 词:钛合金 蒸汽发生管 生产 PDCA 质量控制 

分 类 号:TL353[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象