检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏小东[1] 涂小仙[2] 曹丽丽[3] 桑廷义[2] 王亚楠[3] 王贵艳[3] 朱建玲[3] 庞雪燕 李鹏[3]
机构地区:[1]东方地球物理公司研究院地质研究中心,河北涿州072751 [2]吐哈油田分公司开发处,新疆鄯善838200 [3]东方地球物理公司研究院,河北涿州072751
出 处:《石油地球物理勘探》2008年第S1期92-97,195+10,共8页Oil Geophysical Prospecting
摘 要:丘陵油田是吐哈盆地最大的油田,也是地质特征最为复杂、油田开发问题最为突出的油田之一。经过10余年的开发,油田进入开发调整阶段,在油田开发调整过程中,遇到了一系列应用井筒资料、开发资料无法解决的地质难题。鉴于此,在丘陵油田实施了高精度三维地震采集、处理、解释一体化工程,取得了显著的效果,本文重点介绍在高精度三维地震资料精细解释过程中应用新地质理论、新技术取得的地质效果和认识。Hill Oilfield is the largest oilfield in Tu-Ha Oilfield,and is also the one of oilfields characterized by complex geologic feature and many difficulties in oilfield development.After more than 10 year s development,the oilfield entered adjustment stage of development,in which a series of the geologic difficulties unable to be solved by application of borehole data and development data were met.For that reason,the engineering integrating 3-D high-precision seismic acquisition,processing and interpretation wa...
分 类 号:P631.8[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145