检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东工业大学建设学院,广州510006 [2]中水珠江规划勘测设计有限公司,广州510610
出 处:《岩土力学》2009年第2期567-571,共5页Rock and Soil Mechanics
基 金:广东省自然科学基金资助项目(No.06021462)
摘 要:以广州南沙泰山石化仓储区1期淤泥质地基处理工程为背景,介绍了采用动静力排水固结法处理促淤饱和软黏土地基的基本思想和工艺。该工程施工与现场实时监测相结合,利用孔隙水压力、土体分层沉降和载荷试验等检测指标对加固效果进行了监测和检测。工程实践表明,采取动力即低能量"少击多遍"的强夯施工工艺,辅以填土预压和设置竖向塑料排水板的静力方法来加固淤泥质地基,其效果明显,促淤地基的物理力学性能和抗变形性能显著提高,整体加固效果很好,工后各项指标完全达到或超过预期值。The research based on silt ground disposal project of the first stage of Guangzhou Nanshataishan petrifaction storage area,the construction technology and idea of improving saturated soft clay with dynamic-static drainage consolidation method are described.Real time monitoring and inspecting are conducted during construction;improving effects are detected through pore water pressure,layer settlements and plate load tests etc.The results show that it is obvious to improve the silt with the new construction t...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28