检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水利学报》2009年第7期805-812,共8页Journal of Hydraulic Engineering
基 金:国电公司重点科技攻关、国家自然科学基金(5053906050779044);杰出青年基金(50725929)
摘 要:对长潭岗水电站反拱型水垫塘的动水荷载、底板扬压力、锚固钢筋应力、拱端推力等进行了原体观测,并与水工模型试验结果相验证。结果表明反拱型水垫塘可较好地协调地形、结构和水流条件,曲线形状可使水流平顺;由于采用了拱型结构,底板由抗浮稳定转为抗轴向力,从而改善了底板的受力条件。为了预估不同工况条件下水垫塘的工作特性和进一步完善反拱水垫塘设计理论,还对反拱型水垫塘三维流场进行了数值模拟和进一步的水工模型试验。The prototype observation of the energy dissipater in Changtangang Hydro Power Station was carried out, in which the plunge pool floor with counter-arch structure was applied. The observation items cover the hydrodynamic load, uplift pressure of floor, anchor stress and thrusts of arch abutments, etc. The observation results verify that this type of plunge pool can well accommodate the local valley configuration and the counter-arch structure can improve the loading conditions of plunge pool and stabilize the arch abutments. At the same time the flow pattern in the plunge pool is improved and the impacting forces of spillway jet acting on the floor is reduced. In order to perfect the design method of the counter-arch plunge pool and predict its performance at different conditions, the flow characteristics and the anchor stress of the plunge pool are also studied by using numerical computations and hydraulic model test.
分 类 号:TV135.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3