检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚红娟[1] 吕银龙[1] 张天爵[1] 李振国[1] 贾先禄[1] 管锋平[1] 王振辉[1] 林军[1] 林郁正[2]
机构地区:[1]中国原子能科学研究院,北京102413 [2]清华大学工程物理系,北京100084
出 处:《Chinese Physics C》2008年第z1期53-55,共3页中国物理C(英文版)
摘 要:The central region model (CRM) cyclotron is the experimental platform for the key technology study of a high intensity beam cyclotron.In this paper we introduce the spiral inflector and central region designed for the CRM cyclotron,including the physical design,the numerical control machining and the installation precision control techniques.The shape of electrodes is complex,and machining with a strict tolerance must be done by a numerical control machine tool with the number of its axles no less than 4.The electrodes of central region were finished by using 3-axle machine tools.The size of gaps between the ground and Dee tip is very important,a special device was made to guarantee the installation precision,and the error of gaps was controlled within±0.05mm.中心区模型试验装置是进行强流回旋加速器关键技术研究的实验平台.本文介绍了为该试验装置所设计的偏转板和中心区,包括物理设计的考虑、数控加工技术及安装精度的控制技术.由于电磁场的相互作用粒子在偏转板中的的轨迹为螺旋线,其电极形状复杂,加工采用四轴联动以上的数控机床完成.为满足束流动力学的需要,中心区的电极结构比较复杂而且不规则,表面光洁度要求高,另外尺寸和安装位置精度要求严格.中心区曲面电极结构由三轴联动加工中心加工完成,中心区地电极与高频D板头部的电极间隙非常重要,在安装过程中,制作了专用的"电极间隙通止规"控制电极间隙精度在±0.05mm.
关 键 词:high intensity cyclotron spiral inflector central region
分 类 号:TL542[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28