检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏素敏[1] 张天爵[1] 邢建升[1] 李振国[1] 储诚节[1] 吴隆成[1] 贾先禄[1] 潘高峰[1] 葛涛[1] 解怀东[1] 吕银龙[1] 侯世刚[1] 管峰平[1] 安世忠[1] 钟俊晴[1] 杨健俊[1] 姚红娟[1]
出 处:《Chinese Physics C》2008年第z1期77-79,共3页中国物理C(英文版)
摘 要:The first medical high intensity cyclotron CYCIAE-30 and its beam line for the isotope production were built in 1994 at China Institute of Atomic Energy.Now,an upgrading beam line system is designed based on the existing beam line of CYCIAE-30 to transport the beam extracted from the cyclotron to a gas target for the new isotope production,including elements location design,optics simulation and magnet design.The machining and installation of all the elements are accomplished based on the design.The beam tuning is finished and the transmission of 96.5% is obtained.中国原子能科学研究院于1994年研究建成我国第一台医用强流回旋加速器CYCIAE-30及配套放射性同位素生产线,目前为了增加气体靶以生产新品种医用同位素,在原有束流输运线的基础上开展了束流输运系统的升级改造方案设计,包括束流线的总体布局考虑和光学设计,并根据束流光学设计的结果,进行了新增束流线上电磁元件的设计.在物理设计的基础上,还进行了施工设计以及各分系统的加工、调试、安装,并以物理设计得到的参数为依据进行了束流调试,靶上得到的束斑与理论值有较好的符合,满足设计要求.
关 键 词:beam line design optics simulation magnet design beam tuning
分 类 号:TL501.5[核科学技术—核技术及应用] TL503.8
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.5.184