First Superconducting RF System Commissioning for BEPCⅡ in China  

国内首次超导高频系统束流调试及高功率试验

在线阅读下载全文

作  者:孙毅[1] 王光伟[1] 潘卫民[1] 李中泉[1] 黄泓[1] 马强[1] 林海英[1] 徐波[1] 王群要[1] 李少鹏[1] 何昆[1] 刘亚萍[1] 

机构地区:[1]中国科学院高能物理研究所,北京100049

出  处:《Chinese Physics C》2008年第z1期191-193,共3页中国物理C(英文版)

摘  要:The BEPC RF system has been changed to superconducting cavities during the last four years.In the Summer of 2006,the high power test had been successfully carried.In November,the East RF was put into commis- sioning.The SRF system above 1.0MV voltage has been reached with the e^+/e^- collision beam over 100mA,and the beam current improved to 2.5GeV/250mA with 100kW beam power.The beam test shows the good matching of the RF parameters with measuring value and theoretic calculation.The commissioning and the high power test will be presented in this paper.2004—2007年BEPC高频系统从常温腔改建到超导腔,逐渐解决了改频的物理问题和超导技术的工程难题,实现了与国际先进技术接轨,并按期保质完成了工程、调束任务.高频糸统是BEPCⅡ工程首个吸收国外超导技术、自主完成集成和调试成功的大型装置;2006年7月国内首次超导高频大功率试验成功;2006年11月完成系统联调,按期投入BEPCⅡ首轮调束;同年12月首次投入同步辐射运行;2007年2至5月,东、西两套超导高频系统在1MV以上的加速电压均已实现正/负电子1.89GeV注入积累和110/114mA对撞;在同步辐射运行中,逐渐达到2.5GeV/250mA、束流功率100kW,接近国外同类机器水平;束流试验证明两套高频系统的各类参数标定和测量值与理论设计吻合.10个月运行表明系统可靠.本文对BEPCⅡ高频系统的束流联调和高功率试验做简要描述.

关 键 词:SUPERCONDUCTING RF system beam commissioning first high power test 

分 类 号:TL503.2[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象