污水处理BOT项目特许定价的关键风险实证研究  被引量:10

Empirical study of critical risk factors influencing concession pricing of wastewater treatment BOT projects

在线阅读下载全文

作  者:杨卫华[1] 戴大双[1] 韩明杰[1] 

机构地区:[1]大连理工大学管理学院,辽宁大连116024

出  处:《大连理工大学学报(社会科学版)》2006年第2期14-18,共5页Journal of Dalian University of Technology(Social Sciences)

基  金:国家自然科学基金项目(70572097);教育部博士点基金项目(20030141019)

摘  要:BOT项目融资方式在城市污水处理行业中得到广泛的应用,为了解决污水处理特许价格谈判中,政府和承办方忽视风险影响、缺乏合理风险分担机制的问题,通过调查研究数据的统计分析,识别出影响污水处理BOT项目特许价格的9个关键风险,同时给出相应的风险分担建议,为确定污水处理基础特许价格和调整机制提供参考。BOT projects have been widely used in the development of metropolitan wastewater treatment.During the sewage concession tariff negotiation,both governments and sponsors always neglect risk influence on pricing,and lack appropriate risk allocation between them.In order to solve the problem,nine critical risk factors have been identified which influence sewage concession tariff greatly by using questionnaire analyses.All these risk allocation suggestions have also been put forward,which can be used as references to the determination of the sewage concession tariff and adjustment mechanism.

关 键 词:BOT 污水处理项目 特许定价 风险识别 风险分担 

分 类 号:TU992.4[建筑科学—市政工程]

 